A complex of objects of the cult purpose of the Holy Apostle Andrew the First-Called
of the Chernivtsi Diocese of the OCU
Year: 2024
Categories: Public
Location: Chernivtsi, Ukraine
The complex includes building of a church for 800 believers, a monastery, a Sunday school for
16 classrooms with a gym and a multipurpose hall, a chapel for 80 believers.
Construction is planned in two stages, each stage is divided into two launch complexes.
The first launch complex of the first phase provides for the construction of a chapel for 80
believers The maximum height of the chapel building is 20 m. The total area is 265.65 sq.m.
The school building is three-story with one-story volumes of the gym and multifunctional hall. On the first floor, there are offices - administrative premises, conference hall, multifunctional hall with auxiliary premises, lobby, and a gym with changing rooms and bathrooms. Educational facilities occupy the second and third floors with recreation and bathrooms. There is parking for 48 cars in the underground space of the building. The maximum height of the Sunday school building is 15.6 m. The total area of the Sunday school premises is 5341.49 square meters.
The first launch complex of the second phase provides for the construction of a three-story monastery building. On the first floor is a dining room with a kitchen and administrative premises. Single and double rooms
and four-bed rooms occupy the second and third floors. The total number of rooms is 26 (52 places). Maximum height of the monastery building - 11.7 m. The total area of the monastery premises - 1886.6 sq.m.
The second launch complex envisages the construction of a church for 800 believers.
The maximum height of the church building is 35 m. The total area is 1193.85 square meters.
s